After two years of fundraising projects Fredericksburg Nimitz rotary will be replacing the historic cross at Cross Mountain Park. Pictured is the removal of the old cross located at Cross Mountain Park.
Also pictured is the new cross that has been fabricated and scheduled for installation in early March. The old cross was erected sometime in the 1940s. It was in varying stages of deterioration. It was fabricated of a thin metal material that had become rusted and was falling apart. It will be identical to the old cross. After the completion of the cross, the Native Plant Society will be sowing native plant seeds at the park.